99久久免费中文字幕精品,色婷婷色99国产综合精品,久久精品一区二区三区资源网,国产精品香蕉在线观看,99精品日韩,国产亚洲第一精品社区麻豆

Tel:+86 18669716198
Chinese English
Company News Industry News Exhibition News
ANE 30kW pitch controlled wind turbine is successfully completion in Kaishan Island, No more worry for the water and electricity in the hero island!
2019-05-28

ANE 30kW pitch controlled wind turbine is successfully completion in Kaishan Island, No more worry for the water and electricity in the hero island!  

 

Kaishan Island is an isolated island with an area of only 0.013 square kilometers and lacks of water and electricity. It is also called the Yellow Sea Outpost because of its strategic location. 

Regarding to Kaishan Island, local fishermen often said: "Less food, less fresh water, less soil but more stone; Birds do not make nests, but typhoons often come."  Since the harsh natural environment of Kaishan Island, the previous four patch of guards stayed not so long time, the longest people stayed 13 days and the shortest is only 3 days. In 1986, Mr. Wang Jicai aged 26 resolutely boarded Kaishan Island. Then his determination, courage and perseverance infected his wife Ms. Wang Shihua, she followed Wang Jicai to Kaishan Island and built a “female whistle”.

 

The "time model" Wang Jicai and Wang Shihua have insisted on the story of defending the island and contributing to the country for 32 years. They overcome the difficulties which the ordinary people can not imagine, and they have touched countless people by taking "I am keeping the sea defense for the motherland forever" as a lifelong undertaking. At the end of 2018, State Grid Jiangsu Power decided to build a smart micro grid system and a desalination system on the island to improve the working and living environment of the islanders.

 

On January 17, 2019, the first phase of the Kaishan Island Micro grid Transition Project was completed and been put into operation, ensuring the electricity requirement for the island's militia in field of winter heating, lighting, and communications.

 

On 24th May, 2019, ANE 30kW pitch controlled wind turbine and 20m hydraulic tower installation were completion. The marks of the tower surface “The family is the Island, The island is the motherland” makes a great striking. The wind turbine system installation means this micro grid system have been entered into the second phase, also means the electricity supply system being into the 2.0 time!

 

The next step is the complete of solar power system, energy storage system and micro grid system test run etc. The total finished time will be about at middle of June. At that time, the 30kW wind turbine, 120kW solar panel, 600kWh energy storage system and the seawater desalination system (with 10 tons fresh water daily generation) will provide the fresh water and green energy to solve the water and electricity supply completely at this island!

 

Now we review the total installation process for the wind turbine together

Site survey, selected base location

Insert the reinforced steel and rivets in the hard rock of the island

Construct the foundation cage

Concrete construction (from ship to island)

Foundation maintenance

Hydraulic tower base installation

The hydraulic cylinder and The first section tower installation

Tower connection

Hydraulic installation tools test run

Wind turbine body and blades installation

Wind turbine and Tower erect works

Installation completion 

Message

0086 532 80626822

主站蜘蛛池模板: 777奇米影视视频在线播放| 黄色成人在线观看| 日韩欧美国产精品第一页不卡| 精品毛片| 国产视频久久久久| 成人日韩精品| 日韩不卡在线| 五月天婷婷激情网| 日本久久网| 你懂的 在线播放| 久久婷婷伊人| 精品视频免费看| 国产精品九九九久久九九| 亚洲欧洲日产国码二区首页| 四虎影视精品| 日本精品久久久久久久| 免费网站视频| 久久久久久国产视频| 精品久久国产视频| 国产人人看| www.亚洲成在线| 伊人婷婷| 五月婷婷综合激情网| 日韩视频免费在线| 欧美日韩亚洲第一页| 久久伊人成人| 久久婷婷激情综合色综合也去| 精品视频免费播放| 国产美女精品| 国产精品一区二区手机看片| www.久久精品| run away无删减全集动漫免费观看 | 国产高清视频在线播放www色| 777影视电视剧免费看| 国产呻吟| 国产99re| 中国一级毛片免费观看| 深夜久久| 日韩欧美中| 四虎成人免费网站在线| 欧美在线看欧美高清视频免费|